TEKLED

S-Curve Antique Brass and Dimpled Amber Globe Light

Sale price£26.12 Regular price£34.00
Sold outSave £7.88

Size: 2 Globe

Product Overview

Looking for a statement light that adds a touch of vintage charm? Our S-Curve light features an eye-catching antique brass finish and dimpled amber glass globes. Available in 2, 3 or 4 globe options, you can choose the perfect size to suit your space. It’s dimmable too, provided you use dimmable bulbs, so you can create the right ambience at any time.

Key details at a glance:

  • Dimensions (2 globe): 490mm (L) x 265mm (W)
  • Dimensions (3 globe): 590mm (L) x 260mm (W)
  • Dimensions (4 globe): 810mm (L) x 260mm (W)
  • Compatible bulbs: Golf ball
  • Lamp holder type: E27 Edison Screw

Perfect for:

  • Dining rooms: Adds character and creates a warm glow
  • Hallways: Makes a striking first impression
  • Living rooms: Brings warmth to family living spaces
  • Bedrooms: Adds some character to the bedroom

For more details, see the full technical specifications on the corresponding tab.

Technical Specifications

Name S-Curve Antique Brass and Dimpled Amber Globe Light
Product Code 159-17998 | 159-179980 | 159-179981
Power Max 40W/Bulb
Power Source Hardwired
Voltage 220/240V AC 50/60Hz
Lamp Holder Type E27 Edison Screw (ES)
Lamp Holder Quantity 2 | 3 | 4
Protection Class Class I
Dimmability Dimmable if used with dimmable bulbs
Light Source Bulb
Compatible Bulbs Golf Ball
Bulbs Bulb not included
IP Class IP20
Mount Type Semi Flush
Product Dimensions (LxWxH) (DxH) 490x265mm | 590x260mm | 810x170x260mm
Product Length 490mm | 590mm | 810mm
Shape Arm
Made Of Materials Steel, Glass
Product Colour Antique Brass, Amber
Paint Type Electroplated
Shade Material Glass
Size Of Shades 135x120mm | 130x110mm | D130x120mm
Shade Colour Amber
Size Of Rose D120x20mm
Operating Temperature (C) -20/+45C
Warranty 3 year
Net Weight 0.55kg | 0.76kg | 0.95kg
Gross Weight 0.94kg | 1.2kg | 1.53kg
Box Dimension (LxWxH) 420x260x160mm | 540x260x16mm | 770x260x160mm
Box Content 1 pc Light Fixture, User Manual, Accessories Package | 1 pc Light Fixture, User Manual, Accessories Package | 1 pc Light Fixture, User Manual, Accessories Package
Pieces/Box 1
Certifications UKCA, CE, RoHS